Tools / Safety Navigator

United Kingdom

Regulator: Medicines and Healthcare products Regulatory Agency (MHRA)

ICSR reporting timelines

Serious (post-marketing)

15 calendar days

Non-serious (post-marketing)

90 calendar days

Clinical trial

Fatal or life-threatening unexpected serious adverse reactions (SUSARs) must be reported as soon as possible, but no later than 7 calendar days after the sponsor has first knowledge of the case. A follow-up report should be submitted within an additional 8 calendar days. All other SUSARs must be reported as soon as possible, but no later than 15 calendar days

Foreign vs. domestic submission

Both domestic (UK) and foreign (non-UK) serious ICSRs must be submitted to the MHRA. Non-serious only domestic.

PBRER / PSUR / PADER requirements

Pharmaceutical companies to submit PSURs/PBRERs based on the dates set by the European Medicines Agency (EMA) and within 70 calendar days of the data lock point (day 0) for PSURs covering intervals up to 12 months (including intervals of exactly 12 months); and within 90 calendar days of the data lock point (day 0) for PSURs covering intervals in excess of 12 months; the timeline for the submission of ad hoc PSURs requested by national medicines authorities will normally be specified in the request, otherwise the ad hoc PSURs should be submitted within 90 calendar days of the data lock point.

Risk management plan (RMP)

An RMP with a focus on UK-specific risk minimisation measures is required.

Local QPPV requirements

QPPV is required. Must be a resident in UK, or EU QPPV with national contact in UK

PSMF requirements

A PSMF must be maintained for UK authorised products.

Official guidance

This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.

Web version of the Safety Navigator extension. How it differs.