Saudi Arabia
Regulator: Saudi Food and Drug Authority (SFDA) (New Draft GVP in place)
ICSR reporting timelines
Serious (post-marketing)
15 calendar days
Non-serious (post-marketing)
Non-serious unexpected: 15 calendar days. Non-serious expected: 90 calendar days. Submission is mandatory for all non-serious ICSRs that occur in the KSA
Clinical trial
Domestic Fatal or Life-Threatening Unexpected Serious Adverse Reactions (SUSARs): Timeline is no later than 7 calendar days after the sponsor first becomes aware of the event. A detailed follow-up report is typically required within an additional 8 calendar days. All Other Domestic SUSARs: For all other serious adverse reactions that are not fatal or life-threatening but are unexpected, the reporting timeline is no later than 15 calendar days after the sponsor's initial awareness of the case. Foreign Fatal/LT SUSARs must be reported within 15 calendar days
Foreign vs. domestic submission
Marketing authorisation holders shall submit all serious ICSRs that occur inside or outside the KSA to the NPC database. Marketing authorisation holders shall submit all non-serious ICSRs that occur in the KSA to the NPC database
PBRER / PSUR / PADER requirements
PSUR/PBRER. The format of PSUR/PBRERs shall follow the structure described in the annex 1 of Module VII. Submission schedule: At 6 months intervals once the product is authorized, even if it is not marketed. Once a product is marketed, and based on the product international birth date, a 6 monthly PSUR/PBRER submission should be continued following initial placing on the market in the KSA for 2 years, then once a year for the following 2 years and thereafter at 3-yearly intervals. Submission in accordance with the European Union reference date (EURD) list and frequencies is also acceptable. Timelines for submission: Within 70 calendar days of the data lock point for PSUR/PBRERs covering intervals up to 12 months. Within 90 calendar days of the data lock point for PSUR/PBRERs covering intervals in excess of 12 months. Ad hoc PSUR/PBRERs should be submitted within 90 calendar days of the data lock point, unless otherwise specified in the request.
Risk management plan (RMP)
For all new marketing applications, the applicant shall submit an RMP describing the risk management system, together with a summary. A Saudi-Specific Annex (SSA) must be submitted with the RMP whenever an EU RMP (or alternative RMP where no current EU RMP exists) is submitted. The SSA is not required only if the RMP was prepared specifically for Saudi Arabia. An RMP is required for generic products. For other types of applications like "informed consent", "hybrid", "fixed combination", "well established medicinal use" and "biosimilar products" specific requirements apply as detailed in section V.C.1.1 of the guideline.
Local QPPV requirements
Each Pharmacovigilance system can have only one local QPPV. The local QPPV must be a full-time qualified person who resides in KSA. A backup for the QPPV (Deputy QPPV) who resides in KSA and is preferably a Saudi citizen may be at the MAH's disposal permanently and continuously
PSMF requirements
A PSMF is a legal requirement in the KSA. The PSMF shall be located within the KSA, either at the site where the main pharmacovigilance activities are performed or at the site where the QPPV operates.
Official guidance
- sfda.gov.sa (1 of 2)
- sfda.gov.sa (2 of 2)
This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.
Web version of the Safety Navigator extension. How it differs.