Tools / Safety Navigator

Oman

Regulator: Ministry of Health
Directorate General of Pharmaceutical Affairs and Drug Control
Department of Pharmacovigilance and Drug Information

ICSR reporting timelines

Serious (post-marketing)

15 calendar days

Non-serious (post-marketing)

90 calendar days

Clinical trial

Fatal or Life-Threatening Unexpected Serious Adverse Reactions (SUSARs): Timeline is no later than 7 calendar days after the sponsor first becomes aware of the event. A detailed follow-up report is typically required within an additional 8 calendar days. All Other Unexpected Serious Adverse Reactions: For all other serious adverse reactions that are not fatal or life-threatening but are unexpected, the reporting timeline is no later than 15 calendar days after the sponsor's initial awareness of the case.

Foreign vs. domestic submission

Only domestic cases are required to be submitted

PBRER / PSUR / PADER requirements

Pharmaceutical companies to submit PSURs/PBRERs based on the dates set by the European Medicines Agency (EMA) and within 70 calendar days of the data lock point (day 0) for PSURs covering intervals up to 12 months (including intervals of exactly 12 months); and within 90 calendar days of the data lock point (day 0) for PSURs covering intervals in excess of 12 months; the timeline for the submission of ad hoc PSURs requested by national medicines authorities will normally be specified in the request, otherwise the ad hoc PSURs should be submitted within 90 calendar days of the data lock point.

Risk management plan (RMP)

An RMP must be submitted with the dossier during the new registration of medicinal products. It should be a global/EU or Core RMP. Generic products are exempt from RMP submission, but may be required to adhere to new safety measures upon request

Local QPPV requirements

A QPPV is required and must reside in Oman or any other Gulf Cooperation Council (GCC) country. For local Marketing Authorization Holders (MAHs), the QPPV must be a resident of Oman. Multinational MAHs without a scientific office in a GCC country can designate a local safety responsible (LSR) on behalf of the local agent in Oman

PSMF requirements

A PSMF is required. A summary of the PSMF must be included in the marketing authorization application. The PSMF can be located either at the main site of pharmacovigilance activities or at the QPPV's site of operation. The content and format must be in accordance with the current version of the Arab GVP

Official guidance

This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.

Web version of the Safety Navigator extension. How it differs.