Tools / Safety Navigator

Nigeria

Regulator: National Agency for Food and Drug Administration and Control (NAFDAC)

ICSR reporting timelines

Serious (post-marketing)

Serious Unexpected: 72 hours Serious Expected: 15 calendar days.

Non-serious (post-marketing)

Non-serious unexpected: 15 calendar days. Non-serious expected: 90 calendar days.

Clinical trial

Fatal or Life-Threatening Unexpected Serious Adverse Reactions (SUSARs): Timeline is no later than 7 calendar days after the sponsor first becomes aware of the event. A detailed follow-up report is typically required within an additional 8 calendar days. All Other Unexpected Serious Adverse Reactions: For all other serious adverse reactions that are not fatal or life-threatening but are unexpected, the reporting timeline is no later than 15 calendar days after the sponsor's initial awareness of the case.

Foreign vs. domestic submission

Foreign fatal/LT, serious, and non-serious ICSRs are not reportable

PBRER / PSUR / PADER requirements

For new drug molecules, at least every six (6) months for the first two (2) years, annually for the following three (3) years, and every five (5) years, at the time of renewal of license. For listed medicinal products (provisional registration), the Certificate of Registration holder shall submit a PSUR/PBRER every six (6) months for the two (2) year listing period. Each Certificate of Registration holder should be responsible for submitting PSUR/PBRERs for its own products to the Agency according to the following timelines: a. Within 70 calendar days of the data lock point (day 0) for PSUR/PBRERs/ covering intervals up to 12 months (including intervals of exactly 12 months); and b. Within 90 calendar days of the data lock point (day 0) for PSUR/PBRERs covering intervals in excess of 12 months; The timeline for the submission of ad hoc PSUR/PBRERs requested by the Agency will normally be specified in the request, otherwise the ad hoc PSUR/PBRERs should be submitted within 90 calendar days of the data lock point.

Risk management plan (RMP)

RMP submission is required.

Local QPPV requirements

CRHs must have an appropriately qualified person responsible for pharmacovigilance (QPPV) permanently available. The guideline explicitly states that "The QPPV should reside and operate in Nigeria"

PSMF requirements

Pharmacovigilance System Master File (PSMF) is required and must be submitted to NAFDAC during the application for a product's Certificate of Registration. This PSMF must be located in Nigeria

Official guidance

This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.

Web version of the Safety Navigator extension. How it differs.