Tools / Safety Navigator

Malaysia

Regulator: National Pharmaceutical Regulatory Agency (NPRA)

ICSR reporting timelines

Serious (post-marketing)

Fatal or Life-Threatening Serious Cases: 7 calendar days. A complete report must follow within an additional eight (8) calendar days. Non-Fatal/Non-Life-Threatening Serious Cases: As soon as possible, but no later than 15 calendar days

Non-serious (post-marketing)

30 calendar days.

Clinical trial

Fatal or life-threatening cases: No later than seven (7) calendar days after the PRH first has knowledge of the case, with a complete report to follow within an additional eight (8) calendar days. Other serious cases (non-fatal/non-life-threatening): No later than 15 calendar days after the PRH first has knowledge of the case.

Foreign vs. domestic submission

Domestic Cases: All local ADR/AEFI reports must be submitted according to the specified timelines. Foreign Cases: Foreign individual case reports are not required to be submitted on a routine basis.

PBRER / PSUR / PADER requirements

Requirement: The Periodic Benefit-Risk Evaluation Report (PBRER) is the required format and it replaces the previous PSUR format. Frequency for New Drug Products (NDP) and Biologics: For newly approved NDPs and Biologics, PBRERs must be submitted every six (6) months for the first two (2) years post-approval, and then annually for the subsequent three (3) years. Submission Timeline: For reports covering intervals of 6 or 12 months: within 70 calendar days from the Data Lock Point (DLP). For reports covering intervals longer than 12 months: within 90 calendar days from the DLP. For ad hoc PBRERs requested by the Authority: 90 calendar days, unless specified otherwise. Other Products: For products other than NDPs/Biologics (e.g., generics), PBRERs are generally not required unless a specific safety concern arises. The Authority may request an Issue-Related Summary Report (IRSR) instead.

Risk management plan (RMP)

An RMP is required to be submitted as part of the registration dossier for new drug products and biologics. For other products, an RMP is generally not required unless a safety concern affecting the benefit-risk balance arises.

Local QPPV requirements

The PRH must have a Responsible Person for Pharmacovigilance (RPPV). Residency: The RPPV should preferably be based in Malaysia. If the RPPV is based outside Malaysia, a local contact person must be based in Malaysia.

PSMF requirements

All PRHs are required to prepare a PSMF. In addition to the PSMF, PRHs must prepare a PVSS, which is a summary document. PVSS and PSMF are NOT required for traditional medicines and health supplement (TMHS) products

Official guidance

This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.

Web version of the Safety Navigator extension. How it differs.