Kuwait
Regulator: Kuwait Drug and Food Control at the MOH
ICSR reporting timelines
Serious (post-marketing)
15 calendar days
Non-serious (post-marketing)
90 calendar days
Clinical trial
Fatal or Life-Threatening Unexpected Serious Adverse Reactions (SUSARs): Sponsors are expected to report these events to the Kuwaiti MOH as rapidly as possible. The standard international timeline is no later than 7 calendar days after the sponsor first becomes aware of the event. A detailed follow-up report is typically required within an additional 8 calendar days. All Other Unexpected Serious Adverse Reactions: For all other serious adverse reactions that are not fatal or life-threatening but are unexpected, the reporting timeline is no later than 15 calendar days after the sponsor's initial awareness of the case.
Foreign vs. domestic submission
Only domestic cases are required to be submitted
PBRER / PSUR / PADER requirements
Pharmaceutical companies to submit PSURs/PBRERs based on the dates set by the European Medicines Agency (EMA) and within 70 calendar days of the data lock point (day 0) for PSURs covering intervals up to 12 months (including intervals of exactly 12 months); and within 90 calendar days of the data lock point (day 0) for PSURs covering intervals in excess of 12 months; the timeline for the submission of ad hoc PSURs requested by national medicines authorities will normally be specified in the request, otherwise the ad hoc PSURs should be submitted within 90 calendar days of the data lock point.
Risk management plan (RMP)
RMP submission is required under the following circumstances: (1) an EU RMP or a local RMP should be submitted at the time of registering a medicine; and (2) an updated RMP should be submitted at the request of the administration or when there is a signifcant change to the submitted RMP
Local QPPV requirements
Kuwait does not mandate a QPPV or LSR but encourages pharmaceutical companies to have one
PSMF requirements
A PSMF is mandatory for pharmaceutical companies functioning in Kuwait, particularly for the new registration of any company. The frst submission should include both a global and a local summary
Official guidance
This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.
Web version of the Safety Navigator extension. How it differs.