Tools / Safety Navigator

India

Regulator: CDSCO and PvPI

ICSR reporting timelines

Serious (post-marketing)

15 calendar days

Non-serious (post-marketing)

90 calendar days

Clinical trial

14 calendar days

Foreign vs. domestic submission

Only ICSRs for pharmaceutical products marketed or imported in India are required to be submitted. There is no requirement to submit foreign post-marketing ICSRs

PBRER / PSUR / PADER requirements

Frequency: PSURs must be submitted "every six months for the first two years after approval of the drug is granted" and "annually for the subsequent two years". The Licensing Authority may extend this duration if necessary . Timeline: PSURs must be submitted "within thirty calendar days of the last day of the reporting period"

Risk management plan (RMP)

An RMP is a required

Local QPPV requirements

MAHs must appoint a Pharmacovigilance Officer-in-Charge (PVOIC) . Residency: The PVOIC should reside in India

PSMF requirements

MAHs are required to create and maintain a Pharmacovigilance System Master File (PSMF)

Official guidance

This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.

Web version of the Safety Navigator extension. How it differs.