Tools / Safety Navigator

Cuba

Regulator: Center for State Control of Medicines, Equipment and Medical Devices (CECMED)

ICSR reporting timelines

Serious (post-marketing)

Immediately, preferably within the first 24 hours, and not exceeding a period of 72 hours. The regulations mention a 30-calendar-day timeline for submitting the final investigation conclusions for these cases

Non-serious (post-marketing)

Quarterly basis

Clinical trial

Serious and unexpected adverse events must be sent to CECMED within 72 hours of the sponsor's awareness. Subsequently, a formal report is required within 7 calendar days for fatal or life-threatening events, and within 15 days for all other applicable serious and unexpected events

Foreign vs. domestic submission

The MAH is also obligated to notify CECMED of any ADRs that have occurred with its products outside of Cuba, with these foreign cases being included as part of the quarterly report submissions

PBRER / PSUR / PADER requirements

Periodic Safety Report (IPS) in Cuba is required Submission Frequency For New Drugs (Class I, Category A - New Molecular Entities): Medicines: Must be submitted annually for the first 3 years. After that, reports are required at 5 and 10 years, coinciding with the renewal of the sanitary registration. Biologics: Must be submitted every 6 months for the first 2 years of marketing, then annually for the next 3 years. The report at the fifth year will coincide with the registration renewal, with the next one due at 10 years. For New Drugs (Class I, Category B - e.g., new dosage form, new combination): Reports must be submitted annually for the first 2 years after approval. Subsequently, they are required at 5 and 10 years, coinciding with the registration renewal. For Known Drugs (Class II, Category C - e.g., generics circulating for the first time in Cuba): A report must be submitted at 5 years, coinciding with the renewal of the sanitary registration. Submission Deadline: For all categories, the IPS must be submitted within a maximum period of 60 calendar days from the data lock point of the reporting period.

Risk management plan (RMP)

Risk Management Plan, referred to as a "Plan de Gestión de Riesgo" (PGR), is required

Local QPPV requirements

The regulations mandate that the MAH designate a qualified individual as the "Responsable de Farmacovigilancia" (RFV), who serves as the local QPPV

PSMF requirements

Regulations require every MAH to have a "documented pharmacovigilance system"

Official guidance

This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.

Web version of the Safety Navigator extension. How it differs.