Tools / Safety Navigator

Brunei Darussalam

Regulator: Brunei Darussalam Medicines Control Authority (BDMCA)

ICSR reporting timelines

Serious (post-marketing)

All serious fatal or life-threatening spontaneous ADR reports: as soon as possible or within 24 hours after first awareness but no later than 7 calendar days. A complete report should be submitted within 8 additional calendar days from when the first report was submitted. All other serious spontaneous ADR reports: no later than 7 calendar days. A complete report should be submitted within 8 additional calendar days from when the first report was submitted

Non-serious (post-marketing)

Non-serious spontaneous ADR reports: no later than 7 calendar days. A complete report should be submitted within 8 additional calendar days from when the first report was submitted

Clinical trial

Fatal and Life-threatening Serious ADRs/ADEs: Must be reported no later than 7 calendar days. Other Serious ADRs/ADEs: Must be reported no later than 15 calendar days

Foreign vs. domestic submission

Domestic (Local) Cases: All serious and non-serious spontaneous ADRs occurring in Brunei Darussalam must be submitted within the specified timelines . Foreign Cases: Individual ADR reports from outside Brunei Darussalam "need not be submitted to the NADRMC on a routine basis". However, licence holders must inform the authority "no later than 7 calendar days of any posting and/ or action taken by foreign Regulatory Health Authorities relative to the safety or benefit/ risk of a medicinal product marketed in Brunei Darussalam"

PBRER / PSUR / PADER requirements

Frequency & Timelines: • New Chemical Entities (NCEs) registered for < 5 years: PBRERs must be submitted "6 monthly for the first 2 years from the date of its registration in Brunei Darussalam and annually for the subsequent 3 years" . • All other products (NCEs > 5 years, generics): PBRERs are required only "upon request" by the NADRMC . • Submission Deadline: All PBRERs must be submitted "within 90 calendar days from the DLP" (Data Lock Point) or, if requested, within 90 calendar days from the date of the request

Risk management plan (RMP)

Guidelines doesn't explicitly state a mandatory requirement for a RMP

Local QPPV requirements

A local contact person is required.

PSMF requirements

Guidelines doesn't explicitly state a mandatory requirement for a PSMF

Official guidance

This page is a short summary. Requirements change: check the regulator's current guidance before you rely on it.

Web version of the Safety Navigator extension. How it differs.